Boeing Internally Studied 737 MAX Production Ramp-Up to 70 Per Month
An internal Boeing study, codenamed 'Project Falcon,' explored the feasibility of increasing 737 MAX production to an unprecedented 70 aircraft per month. This ambitious target was designed to match the high-volume production rates planned by its chief rival, Airbus, for the A320neo family. The study analyzed the significant investments and supply chain enhancements required to achieve such a rate. While the plan was seriously considered, Boeing's current focus has shifted to stabilizing its system and improving quality. The company now officially targets a more modest rate of 50 aircraft per month in the 2025-2026 timeframe.
Official Source: https://theaircurrent.com/aircraft-production/boeing-737-max-70-per-month-airbus-rate-study/
Related Aviation News:
- Boeing CEO says company met requirements to increase 737 Max production to 47 jets per month
- FAA expects Boeing MAX 7 to be certified this summer, sees more production hikes
- Boeing increasing 737 production after consulting FAA
- Boeing studying increase in 737 MAX production to record 70 jets per month
- Boeing's new 737 Max assembly line opens July 6. The goal: 52 planes a month